Monday, 5 November 2012

Production schedule

Friday 16th November-
Performance filming in the studio for two hours.
Shots I am planning on filming:

  • shots, 6 (long shot of microphones), 
  • shots-7,11,14 (medium shot of male performer), 
  • shot 8 (Medium shot/ Pan of male performer), 
  • shot 9 (Medium tracking shot of male performer), 
  • shots-10,12 (Close up of male performer), 
  • shot 13( High angle shot of male performer), 
  • shot 15(Long shot of male performer). 
Friday 23rd November-
Performance filming in the studio for two hours.
Shots I am planning on filming:

  • shot 45(Medium shot, into a zoom of Iona and Danny), 
  • shot 46 (Close up of Iona), 
  • shot 49 (over the shoulder shot of Iona), 
  • shot 50(Side shot of Danny and Iona), 
  • shot 81(Long shot, tracking shot of Iona and Danny).
Sunday 25th November-
Narrative filming at North ferriby woodland, and Hessle foreshore.
Shots I am planning on filming;

  • shot 16(Long shot of a nature scene), 
  • shot 17(Medium shot of Lucy walking round tree), 
  • shot 18(Close up/Zoom of Lucy), 
  • shot 21(Long shot of Lucy walking into pond/river), 
  • shot 22,23(Long shot/ tracking shot of Lucy walking into river/ pond), 
  • shot 24(Medium close up of Lucy in river/pond), 
  • shot 25(Long shot of Lucy's shoes walking in woodland), 
  • shot 26, 27(high angle and low angle shots of leaves failing), 
  • shot 29(long shot of leaves falling on Lucy), 
  • shot 32,33(Medium shot of Lucy spinning round in the river).

No comments:

Post a Comment